{"id":31163,"date":"2022-06-29T05:02:09","date_gmt":"2022-06-29T09:02:09","guid":{"rendered":"https:\/\/coinscreed.com\/staging\/?p=31163"},"modified":"2022-06-29T05:02:15","modified_gmt":"2022-06-29T09:02:15","slug":"two-weeks-after-major-storm-75-of-marathons-mining-fleet-still-inactive","status":"publish","type":"post","link":"https:\/\/coinscreed.com\/staging\/two-weeks-after-major-storm-75-of-marathons-mining-fleet-still-inactive\/","title":{"rendered":"Two weeks after major storm, 75% of Marathon&#8217;s mining fleet still inactive"},"content":{"rendered":"\n<p>Since a violent storm struck Montana on June 11, 75 per cent of Marathon's mining capacity has been inoperable.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-1024x614.png\" alt=\"Two weeks after major storm, 75% of Marathon's mining fleet still inactive\" class=\"wp-image-31168\" srcset=\"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-1024x614.png 1024w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-300x180.png 300w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-768x460.png 768w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-150x90.png 150w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-750x450.png 750w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon-1140x683.png 1140w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon.png 1201w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Two weeks after major storm, 75% of Marathon's mining fleet still inactive<\/figcaption><\/figure>\n\n\n\n<p>Although it would take some time to restore the facility to full functionality, Marathon's mining CEO Fred Thiel suggested that the company may decide to accelerate its relocation from Hardin.<\/p>\n\n\n\n<p>Marathon Digital Holdings, a <a href=\"https:\/\/coinscreed.com\/staging\/uzbekistan-accepts-bitcoin-mining-only-using-solar-energy.html\" target=\"_blank\" rel=\"noreferrer noopener\">bitcoin (BTC) mining company,<\/a> has disclosed that since a violent storm struck Montana on June 11, 75% of its mining capacity has been inoperable.<\/p>\n\n\n\n<p>The storm that hit Hardin, Montana on June 11 caused damage to the power plant that powers <a href=\"https:\/\/www.google.com\/search?q=Two+weeks+after+major+storm%2C+75%25+of+Marathon%27s+mining+fleet+still+inactive&oq=Two+weeks+after+major+storm%2C+75%25+of+Marathon%27s+mining+fleet+still+inactive&aqs=chrome..69i57.963j0j9&sourceid=chrome&ie=UTF-8\" target=\"_blank\" rel=\"noreferrer noopener\">Marathon's <span class=\"wpil-link-icon\" title=\"Link goes to external site.\" style=\"margin: 0 0 0 5px;\"><svg width=\"24\" height=\"24\" style=\"height:16px; width:16px; fill:#000000; stroke:#000000; display:inline-block;\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:svg=\"http:\/\/www.w3.org\/2000\/svg\"><g id=\"wpil-svg-outbound-7-icon-path\" fill=\"none\" clip-path=\"url(#clip0_31_188)\">\r\n                            <path d=\"M9.16724 14.8891L20.1672 3.88908\" stroke-linecap=\"round\"\/>\r\n                            <path d=\"M13.4497 3.53554L20.5208 3.53554L20.5208 10.6066\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\/>\r\n                            <path d=\"M17.5 13.5L17.5 16.26C17.5 17.4179 17.5 17.9968 17.2675 18.4359C17.0799 18.7902 16.7902 19.0799 16.4359 19.2675C15.9968 19.5 15.4179 19.5 14.26 19.5L7.74 19.5C6.58213 19.5 6.0032 19.5 5.56414 19.2675C5.20983 19.0799 4.92007 18.7902 4.73247 18.4359C4.5 17.9968 4.5 17.4179 4.5 16.26L4.5 9.74C4.5 8.58213 4.5 8.0032 4.73247 7.56414C4.92007 7.20983 5.20982 6.92007 5.56414 6.73247C6.0032 6.5 6.58213 6.5 7.74 6.5L11 6.5\" stroke-linecap=\"round\"\/>\r\n                        <\/g>\r\n                        <defs>\r\n                            <clipPath id=\"clip0_31_188\">\r\n                                <rect fill=\"white\" height=\"24\" width=\"24\"\/>\r\n                            <\/clipPath>\r\n                        <\/defs><\/svg><\/span><\/a>nearby mining facilities, Marathon finally explained in a statement posted to its website on Tuesday. The firm claims that \u201cinitial electrical tests have found that the majority of the Company\u2019s miners were not materially damaged by the storm.\u201d<\/p>\n\n\n\n<p>The business reported that 30,000 devices, or 75% of its fleet, have been inoperable since the storm. Blockchain explorers for bitcoin show that the miners have been offline for 2.5 weeks:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\" id=\"h-with-these-miners-offline-marathon-s-bitcoin-production-is-expected-to-be-significantly-reduced-until-repairs-to-the-power-generating-facility-in-montana-can-be-completed-or-until-the-miners-can-be-relocated-to-new-facilities\"><p>\u201cWith these miners offline, Marathon\u2019s Bitcoin production is expected to be significantly reduced until repairs to the power generating facility in Montana can be completed or until the miners can be relocated to new facilities.\u201d<\/p><\/blockquote>\n\n\n\n<p>Marathon noted that the facility would be without electricity until<a href=\"https:\/\/coinscreed.com\/staging\/before-btc-hit-69k-bitcoin-mining-revenue-mirrors-2021-lows.html\" target=\"_blank\" rel=\"noreferrer noopener\"> BeoWulf Energy's <\/a>damaged power plant could be rebuilt.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"embed-twitter\"><blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\"><p lang=\"en\" dir=\"ltr\"><a href=\"https:\/\/twitter.com\/search?q=%24MARA&src=ctag&ref_src=twsrc%5Etfw\" target=\"_blank\" rel=\"noopener\">$MARA<span class=\"wpil-link-icon\" title=\"Link goes to external site.\" style=\"margin: 0 0 0 5px;\"><svg width=\"24\" height=\"24\" style=\"height:16px; width:16px; fill:#000000; stroke:#000000; display:inline-block;\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:svg=\"http:\/\/www.w3.org\/2000\/svg\"><use href=\"#wpil-svg-outbound-7-icon-path\"><\/use><\/svg><\/span><\/a> Update on mining ops in Montana \ud83d\udc47<br><br>&#8211; Severe storm passed through Hardin on 6\/11<br>&#8211; Power plant cooling towers need repairs<br>&#8211; Majority of miners not damaged<br>&#8211; Miners outside Hardin (0.6 EH\/s) remain hashing via 3rd party pool <a href=\"https:\/\/t.co\/ZcaD30S1bh\" target=\"_blank\">https:\/\/t.co\/ZcaD30S1bh<span class=\"wpil-link-icon\" title=\"Link goes to external site.\" style=\"margin: 0 0 0 5px;\"><svg width=\"24\" height=\"24\" style=\"height:16px; width:16px; fill:#000000; stroke:#000000; display:inline-block;\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:svg=\"http:\/\/www.w3.org\/2000\/svg\"><use href=\"#wpil-svg-outbound-7-icon-path\"><\/use><\/svg><\/span><\/a><\/p>&mdash; MARA (@MARA) <a href=\"https:\/\/twitter.com\/MARA\/status\/1541880743839911940?ref_src=twsrc%5Etfw\" target=\"_blank\" rel=\"noopener\">June 28, 2022<span class=\"wpil-link-icon\" title=\"Link goes to external site.\" style=\"margin: 0 0 0 5px;\"><svg width=\"24\" height=\"24\" style=\"height:16px; width:16px; fill:#000000; stroke:#000000; display:inline-block;\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:svg=\"http:\/\/www.w3.org\/2000\/svg\"><use href=\"#wpil-svg-outbound-7-icon-path\"><\/use><\/svg><\/span><\/a><\/blockquote><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/div>\n<\/div><\/figure>\n\n\n\n<p>If necessary repairs are performed in time, according to<a href=\"https:\/\/coinscreed.com\/staging\/marathon-digital-pushes-for-carbon-neutrality-at-montana-bitcoin-mine.html\" target=\"_blank\" rel=\"noreferrer noopener\"> Marathon's<\/a> CEO Fred Thiel, the facility might start mining again as early as the first week of July, albeit at a reduced capacity.<\/p>\n\n\n\n<p>While the damaged facility is being repaired, it has directed its remaining hashing power to donate to external mining pools:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\" id=\"h-marathon-has-pointed-its-remaining-active-miners-representing-approximately-0-6-eh-s-away-from-the-company-s-mining-pool-marapool-and-towards-a-third-party-mining-pool-in-order-to-increase-the-probability-of-earning-bitcoin\"><p>\u201cMarathon has pointed its remaining active miners, representing approximately 0.6 EH\/s, away from the Company\u2019s mining pool, MaraPool, and towards a third-party mining pool in order to increase the probability of earning Bitcoin.\u201d<\/p><\/blockquote>\n\n\n\n<p>Exahash per second (EH\/s) is the measure of a miner's contribution to the hashpower needed to protect the Bitcoin network.<\/p>\n\n\n\n<p>According to CoinGecko, through May, Marathon received 3.9 EH\/s from 36,830 active miners and held 9,941 BTC worth around $201.4 million.<\/p>\n\n\n\n<p>According to Bitcoin network tracker CoinWarz, mining difficulty is at its lowest point since April.<\/p>\n\n\n\n<p>According to the corporation, 19,000 miners totaling 1.9 EH\/s had been placed in facilities in Texas and were awaiting the energy required to turn them on.<\/p>\n\n\n\n<p>The company stated that it is &#8220;currently evaluating the possibility of expediting the move of its miners from Montana to new hosting locations&#8221; in light of the functional outages brought on by the storm in Hardin. This could include a quicker deployment to its new Texas facilities to ensure that this problem in Hardin doesn't occur again.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since a violent storm struck Montana on June 11, 75 per cent of Marathon&#8217;s mining capacity has been inoperable. Although it would take some time to restore the facility to full functionality, Marathon&#8217;s mining CEO Fred Thiel suggested that the company may decide to accelerate its relocation from Hardin. Marathon Digital Holdings, a bitcoin (BTC) [&hellip;]<\/p>\n","protected":false},"author":38,"featured_media":31168,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-31163","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_featured_media_url":"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2022\/06\/BitcoinMarathon.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts\/31163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/comments?post=31163"}],"version-history":[{"count":0,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts\/31163\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/media\/31168"}],"wp:attachment":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/media?parent=31163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/categories?post=31163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/tags?post=31163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}