{"id":44272,"date":"2023-01-23T12:28:06","date_gmt":"2023-01-23T16:28:06","guid":{"rendered":"https:\/\/coinscreed.com\/staging\/?p=44272"},"modified":"2023-01-23T12:28:09","modified_gmt":"2023-01-23T16:28:09","slug":"nuclear-powered-mining-company-to-begin-operations-in-the-us","status":"publish","type":"post","link":"https:\/\/coinscreed.com\/staging\/nuclear-powered-mining-company-to-begin-operations-in-the-us\/","title":{"rendered":"Nuclear-powered mining company to begin operations in the US"},"content":{"rendered":"\n<h5 class=\"wp-block-heading\" id=\"h-cumulus-data-a-division-of-independent-power-producer-talen-energy-and-maker-of-zero-carbon-data-centers-will-apparently-be-the-first-nuclear-run-bitcoin-mining-company-to-begin-operations-in-the-united-states\">Cumulus Data, a division of independent power producer Talen Energy and maker of<a href=\"https:\/\/coinscreed.com\/staging\/list-of-top-15-crypto-mining-companies.html\" target=\"_blank\" rel=\"noreferrer noopener\"> zero-carbon data centers<\/a> will apparently be the first nuclear-run Bitcoin mining company to begin operations in the United States.<\/h5>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30.png\" alt=\"Nuclear-powered mining company to begin operations in the US\" class=\"wp-image-44274\" width=\"986\" height=\"318\" srcset=\"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30.png 862w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30-300x97.png 300w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30-768x248.png 768w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30-150x48.png 150w, https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30-750x242.png 750w\" sizes=\"(max-width: 986px) 100vw, 986px\" \/><figcaption class=\"wp-element-caption\">Nuclear-powered mining company to begin operations in the US<\/figcaption><\/figure>\n\n\n\n<p>The powered shell for Cumulus Data's first data center powered by a 2.5-gigawatt nuclear power plant has reportedly been completed. Cumulus Data is a maker of zero-carbon data centers and a division of independent power producer Talen Energy.<\/p>\n\n\n\n<p>The 48MW, 300,000-square-foot data center is instantly linked to the Susquehanna nuclear power facility in northeastern Pennsylvania. The first cloud computing and <a href=\"https:\/\/www.google.com\/search?q=Nuclear-powered+mining+company+to+begin+operations+in+the+US&rlz=1C1SQJL_enNG889NG889&oq=Nuclear-powered+mining+company+to+begin+operations+in+the+US&aqs=chrome..69i57j33i160.585j0j9&sourceid=chrome&ie=UTF-8\" target=\"_blank\" rel=\"noreferrer noopener\">Bitcoin mining facility<span class=\"wpil-link-icon\" title=\"Link goes to external site.\" style=\"margin: 0 0 0 5px;\"><svg width=\"24\" height=\"24\" style=\"height:16px; width:16px; fill:#000000; stroke:#000000; display:inline-block;\" viewBox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:svg=\"http:\/\/www.w3.org\/2000\/svg\"><g id=\"wpil-svg-outbound-7-icon-path\" fill=\"none\" clip-path=\"url(#clip0_31_188)\">\r\n                            <path d=\"M9.16724 14.8891L20.1672 3.88908\" stroke-linecap=\"round\"\/>\r\n                            <path d=\"M13.4497 3.53554L20.5208 3.53554L20.5208 10.6066\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\/>\r\n                            <path d=\"M17.5 13.5L17.5 16.26C17.5 17.4179 17.5 17.9968 17.2675 18.4359C17.0799 18.7902 16.7902 19.0799 16.4359 19.2675C15.9968 19.5 15.4179 19.5 14.26 19.5L7.74 19.5C6.58213 19.5 6.0032 19.5 5.56414 19.2675C5.20983 19.0799 4.92007 18.7902 4.73247 18.4359C4.5 17.9968 4.5 17.4179 4.5 16.26L4.5 9.74C4.5 8.58213 4.5 8.0032 4.73247 7.56414C4.92007 7.20983 5.20982 6.92007 5.56414 6.73247C6.0032 6.5 6.58213 6.5 7.74 6.5L11 6.5\" stroke-linecap=\"round\"\/>\r\n                        <\/g>\r\n                        <defs>\r\n                            <clipPath id=\"clip0_31_188\">\r\n                                <rect fill=\"white\" height=\"24\" width=\"24\"\/>\r\n                            <\/clipPath>\r\n                        <\/defs><\/svg><\/span><\/a> in the US will be located on its 1,200-acre campus.<\/p>\n\n\n\n<p>Phase 1 of the project now includes two more in active development, bringing the campus's total estimated capacity to 475 megawatts. Cumulus Data also discovered 18 other Talen Energy sites that can possibly house data centers with easy connectivity to the power plant.<\/p>\n\n\n\n<p>Despite the fact that development on the Bitcoin mining facility was briefly halted in early December 2022, TeraWulf recently said that it was in the early phases of scaling up its mining activities, for which it expects to supply 50MW.<\/p>\n\n\n\n<p>The establishment of the Nautilus Cryptomine, a zero-carbon Bitcoin mining facility, was made public when Talen Energy and the American cryptocurrency <a href=\"https:\/\/coinscreed.com\/staging\/sbf-disputes-ftxs-interest-in-troubled-cryptocurrency-mining-firms.html\" target=\"_blank\" rel=\"noreferrer noopener\">mining firm<\/a> TeraWulf decided to form a joint venture.<\/p>\n\n\n\n<p>In yet another low-cost effort to raise money to safeguard the forests and wildlife in Africa's oldest protected park, which have been harmed by years of militia violence, deforestation, and insufficient government support, the Virunga National Park in eastern Congo is using hydroelectricity to mine bitcoin.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cumulus Data, a division of independent power producer Talen Energy and maker of zero-carbon data centers will apparently be the first nuclear-run Bitcoin mining company to begin operations in the United States. The powered shell for Cumulus Data&#8217;s first data center powered by a 2.5-gigawatt nuclear power plant has reportedly been completed. Cumulus Data is [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":44274,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[754,13125,13127,13126],"class_list":["post-44272","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bitcoin-mining","tag-cumulus-data","tag-nuclear-power","tag-talen-energy"],"jetpack_featured_media_url":"https:\/\/coinscreed.com\/staging\/wp-content\/uploads\/2023\/01\/image-30.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts\/44272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/comments?post=44272"}],"version-history":[{"count":0,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/posts\/44272\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/media\/44274"}],"wp:attachment":[{"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/media?parent=44272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/categories?post=44272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/coinscreed.com\/staging\/wp-json\/wp\/v2\/tags?post=44272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}